STUDI KELAYAKAN PENINGKATAN JALAN SEKAPUK – UJUNGPANGKAH KABUPATEN GRESIK DITINJAU DARI ASPEK LALU LINTAS DAN INVESTASI

STUDI KELAYAKAN PENINGKATAN JALAN SEKAPUK – UJUNGPANGKAH KABUPATEN GRESIK DITINJAU DARI ASPEK LALU LINTAS DAN INVESTASI

Authors

  • Afifa Yhulandari, M. Adik Rudiyanto, Edhi Soewartono Universitas Islam Majapahit

Keywords:

Kelayakan, Lalu Lintas, Investasi.

Abstract

Abstract
One area in Gresik Regency that is currently developing is the Sekapuk - Ujungpangkah road in Gresik Regency. The capacity of existing roads is 1,649.2 pcu / hour with a degree of saturation (DS) of 0.63, the figure is almost close to the permissible degree of saturation that is based on (MKJI, 1997) The degree of saturation that occurs must be below 0.75 and planning must be below 0.75. The level of service at the existing road level is included in category C. The purpose of this research is to analyze the feasibility of planning the improvement of the Sekapuk - Ujungpangkah Road in Gresik Regency in terms of traffic engineering aspects and investment financing. The research method used is with and without planned (before and after). Where with this method traffic conditions will be compared using indicators of Degree of Saturation (DS) and Service Level (LoS) while the feasibility of investment financing is the value of NPV, BCR, and IRR. Based on the analysis results obtained the degree of saturation (DS) of 0.43 <0.75, while the level of service is to be B while for investment financing analysis obtained the value of Benefit Cost Ratio (BCR) 1.495> 1, Net Present Value (NPV) is worth positive that is Rp. 34,764,824,948, and Internal Rate of Return (IRR) 10%> 4% (discount factor). The benefits of the investment are divided into two, namely vehicle operating cost savings obtained value of Rp. 221,474,878,948.08 and time value saving of Rp. 119,752,623,772.10. Based on the analysis, it was stated that the project was technically feasible for traffic and investment financing to be carried out.
Keywords: Feasibility, Traffic, Investment.

References

[1] Grigg, N. 1988, Infrastructure Engineering and Management, John Wiley & Sons.Widyadiningsih
[2] Badan Pusat Statistik [BPS]. 2018. Statistik Daerah Kecamatan Ujungpangkah 2018:
Badan Pusat Statistik Kabupaten Gresik.RTRWGresik
[3] Direktorat Jenderal Bina Marga. 1997. Manual Kapasitas Jalan Indonesia (MKJI), Departemen Pekerjaan Umum, Jakarta.
[4] Anonim, 2006, Peraturan Pemerintah Republik Indonesia No 34 Tahun 2006 Tentang Jalan, Sekretariat Negara, Jakarta
[5] Husnan, Suad dan Enny Pudjiastuti, (2015), Dasar-Dasar Manajemen Keuangan, Edisi Ketujuh. Yogyakarta: UPP STIM YKPN.
[6] LPM ITB, 1997. Modul Pelatihan Perencanaan Sistem Angkutan Umum”, KBK. Rekayasa Transportasi, Jurusan Teknik Sipil ITB, Bandung.
[7] ---, 2009, Undang-undang No.22 Tahun 2009 tentang Lalu Lintas dan Angkutan Jalan
[8] M. Kadarman, 1996, Pengantar Ilmu Manajemen, PT. Gramedia Pustaka Utama, Jakarta.
[9] Clarkson H. Oglesby dan R. Gary Hicks, 1999, Teknik Jalan Raya (ahli bahasa), Edisi Keempat Jilid Satu
[10] Tandelilin, Eduardus. 2010. Portofolio dan Investasi Teori dan Aplikasi. Edisi pertama.
Yogyakarta : Kanisius
[11] Kuiper, E. 1971. Water Resources Project Economics. London : Butterworth & Co (Publisher) Ltd.
[12] Asiyanto, 2005. Construction Project Cost Management. Jakarta : Pradnya Paramita.
[13] Giatman, M. “Ekonomi Teknik”. PT. Raja Grafindo Persada, Jakarta. 2006
[14] Menteri Perhubungan (2006), Peraturan Menteri Perhubungan Nomor : KM 14 Tahun 2006 tentang Manajemen dan Rekayasa Lalu Lintas di Jalan. Menteri Perhubungan. Jakarta.

Published

2020-01-18